Cold Rolling Mill Complex

Cold Rolling Mill Complex

Project Overview

Comprehensive structural steel fabrication and erection for Shyam Sel & Power Ltd.

Client Name

Shyam Sel & Power Ltd.

Location

Jamuria, Asansol (West Bengal).

Project Area

85166 Sq Mtrs.

Capacity

0.35 MTPA (P1+P2)

Duration

2 Years

Project Title

Cold Rolling Mill Complex

Brief Description of Project: Cold Rolling Mill Shed Fabrication & Erection with Utility Installations

The project involves the fabrication, surface preparation, painting, supply, and erection of structural steel for the Cold Rolling Mill (CRM) complex, along with the installation of associated utility plants and pipelines. The total estimated structural steel tonnage is approximately 10000 MT.

Project Scope

The scope of work covers the complete fabrication and site erection of structural steel & Utility Plants for the following major areas:

  • Pickling & HRS Shed – Fabrication and erection of structural framework for housing the pickling line and cold rolled steel processing area.
  • Mill Bay Shed – Heavy-duty structural shed designed for the installation of rolling mill equipment, cranes, and maintenance platforms.
  • GIGL 1250 & GIGL 1500 Sheds – Structural fabrication and erection for Galvanizing Lines 250 & 1500, including platforms, service structures, and crane supports.
  • CCL & Finishing Shed – Construction of steel structures for Continuous Cleaning Line and finishing sections with walkways, access platforms, and service structures.
  • Utility Sheds – Fabrication and erection of auxiliary sheds such as Boiler Shed, Nitrogen (N₂) Shed, Hydrogen (H₂) Shed, and other utility buildings essential for plant operations.
  • N₂ Plant Installation (400 Nm³/hr & 600 Nm³/hr) – Installation of nitrogen generation plants along with instrumentation pipelines and associated utility connections.
  • H₂ Plant Installation (90 Nm³/hr & 200 Nm³/hr) – Installation of hydrogen generation units including instrumentation pipeline work and required interconnections.
  • Cooling Tower & Pump House Installation (600 m³/hr & 800 m³/hr) – Erection and installation of cooling towers and pump houses, along with process and return pipelines.
  • BFG Plant Installation (1600 mm WC) – Installation of Blast Furnace Gas (BFG) system including pipeline fabrication and erection for gas distribution and control.

Site Selection For Fabrication Yard

Advantages of selected site – Location criteria.

Geographical position

Plan Master Layout

Process Flow Chart

Equipment and Machinery In CRM Plant

Major equipment’s In CRM plant-

  1. HR SLITTER- 2000mm Width
  2. PICKLING LINE- 1500mm Width
  3. 6HI COLD ROLLING MILL- 1250mm wide @ 1200 MPM.
  4. CGL 1250 Width
  5. CCL 1500 Width
  6. TRIMMER Line – 1200 Wide @ 400 MPM
  7. TRIMMER Line – 1200 Wide @ 400 MPM

Manpower and Training

Organization structure
• Manpower requirements: skilled, semi-skilled, unskilled example –

S.No. Description Number
1 Site Incharge 2
2 Project Co-ordinator 1
3 Project Engineer 5
4 Supervisors and Safety Officer 15
5 Foremen 10
6 Workers 320
7 QA/QC 2
8 HR 2
TOTAL 357

Glimpse of Completed Work

Pickling & HRS Bay Shyam

Pickling & HRS Bay

Mill Bay Shed Shyam

Mill Bay Shed

CGL Bay

GIGL BAY

CCL Bay & Finishing Bay

Nitrogen Plant

Hydrogen Plant

Utility

Chat with us!